Blue Sky Uranium Step-Out Drilling Program Confirms Expansion at Ivana Deposit, Amarillo Grande Project

Blue Sky Uranium Step-Out Drilling Program Confirms Expansion at Ivana Deposit, Amarillo Grande Project
Blue Sky Uranium Step-Out Drilling Program Confirms Expansion at Ivana Deposit, Amarillo Grande Project
Share:

Blue Sky Uranium Corp. informed that results from the recently completed reverse circulation (RC) drilling program have confirmed the southern expansion of the Ivana Uranium-Vanadium deposit on its wholly-owned Amarillo Grande Uranium-Vanadium project in Rio Negro province.

Analytical results have been received to date from all 61 holes drilled (totaling 1,043 metres) in the recently completed RC drilling program. They demonstrate that the Ivana Uranium-Vanadium deposit extends more than 1,000 metres to the south of the current mineral resource. Highlight analytical results are compiled in Table 1 below.

amarillotabla

«We are pleased that drilling in the Ivana uranium-vanadium deposit area has demonstrated it is open to expansion outside of the current mineral resource” stated Nikolaos Cacos, Blue Sky President & CEO. “Blue Sky continues to advance high-priority targets in the Ivana area while progressing the processing design and metallurgical test work to support a PEA.”

The Company continues to advance with its ongoing mineralogical, metallurgical, and process engineering studies at the Saskatchewan Research Council (SRC) under the guidance of the Company’s Technical Advisor, Chuck Edwards P.Eng. The objectives of the work at SRC include confirming the balance of uranium and vanadium in the ore preparation, and optimizing the leach extraction rate and recovery, in support of a Preliminary Economic Assessment (PEA). The work will include QEMSCAN® quantitative mineralogy testing and customized leach experiments. Preliminary QEMSCAN® mineralogy was conducted in June and has aided in the design of the current metallurgical and process testing.

 

About the Amarillo Grande Project

The Company’s 100% owned Amarillo Grande Uranium-Vanadium Project in Rio Negro Province, is a new uranium district controlled by Blue Sky. The Project includes several major target areas over a regional trend, with uranium and vanadium mineralization in loosely consolidated sandstones and conglomerates, at or near surface. The area is flat-lying, semi-arid and accessible year-round, with nearby rail, power and port access. The Company’s strategy includes delineating resources at multiple areas for which a central processing facility could consolidate production. The Ivana deposit is the cornerstone of the Project and the first area to have a NI 43-101 Inferred Resource estimate, which includes 23.9 million tonnes averaging 0.036% U308 and 0.019% V2O5, containing 19.1 million pounds of U3O8 and 10.2 million pounds of V2O5, at a 100 ppm uranium cut-off.

Published by: Panorama Minero

Category: News

Revista

Edición 533 - agosto 2024
Edición 532 - Julio 2024
Edición 531 - Junio 2024
Edición 530 - Mayo 2024
Edición 529 - Abril 2024
2024 Argentine Mining Compendium
Edición 528 - Marzo 2024
Edición 527 - Febrero 2024
Edición 526 - Diciembre 2023
Edición 525 - Noviembre 2023
Edición 524 - Octubre 2023
Edición 523 - Septiembre 2023

Eventos

  • Expo San Juan
  • Lithium in South America

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Imagen ilustrativa para el artículo: Argentina Lithium & Energy adquiere nuevas propiedades de litio en Argentina

Argentina Lithium & Energy adquiere nuevas propiedades de litio en Argentina

La compañía canadiense, miembro del Grosso Group, anunció la finalización de acuerdos de opción para adquirir casi 25.400 hectáreas de tierras ricas en litio en sus proyectos Rincón Oeste, Pocitos y Antofalla Norte. En un entorno bajista, este movimiento estratégico subraya la visión de la empresa en la búsqueda por expandir su cartera de proyectos.
Imagen ilustrativa para el artículo: Salta: AbraSilver completa la Evaluación de Impacto Ambiental para el proyecto Diablillos

Salta: AbraSilver completa la Evaluación de Impacto Ambiental para el proyecto Diablillos

AbraSilver Resource Corp. anunció la finalización de la Evaluación de Impacto Ambiental (EIA) para su proyecto de plata y oro Diablillos, ubicado en Salta. La culminación de esta evaluación marca un avance crucial hacia la fase de desarrollo del proyecto, que espera alcanzar positivos rendimientos en torno al uso del agua, el ambiente y el impacto socioeconómico.
Imagen ilustrativa para el artículo: San Juan presente en el "Encuentro Minero Chileno - Argentino"

San Juan presente en el "Encuentro Minero Chileno - Argentino"

Organizada por la Embajada Argentina en el país vecino y la Cámara Chileno Argentina, se llevó a cabo la séptima edición del "Encuentro Minero Chileno Argentino", que congrega a los principales actores de la industria minera de ambos países, con la participación de una delegación minera de San Juan, encabezada por el ministro de Minería, Juan Pablo Perea.