Orocobre Limited, the Australian company that manages Olaroz lithium project, located in Jujuy province, published results for the quarter ended at 30 June.

Olaroz lithium facility (Orocobre 66.5% / All amounts on a 100% basis)

  • Production for the quarter was the second highest on record at 3,596 tonnes of lithium carbonate, up 28% on the March quarter
  • Record realised average price achieved of US$13,653/tonne on a free on-board basis (FOB)
  • Record quarterly sales revenue of US$44.4 million on total sales of 3,255 tonnes of lithium carbonate (varies from ASX release 2 July 2018 due to unforeseeable port shipping delays, these sales will now be recognised in the September quarter)
  • Cash costs for the quarter (on cost of goods sold basis) were down 13% quarter on quarter (QoQ) to US$3,800/tonne as a result of increased production and sales volumes
  • Record gross cash margins of US$9,853/tonne were up 7% QoQ demonstrating the profitability and cash generation capability of the Olaroz operations

 

Fiscal Year 2018

  • Production for fiscal year to 30 June 2018 was a record 12,470 tonnes, up 5% year on year (YoY)
  • Total sales volume of 11,837 tonnes
  • Average price received for fiscal 2018 was a new high of US$12,578/tonne, up 29% YoY
  • Total sales revenue for the year to 30 June 2018 was a record US$148.9 million, up 24% on the previous year.

 

Lithium Growth Projects

  • A US$40 million early works program has commenced as part of the Stage 2 expansion with the construction of ponds, roads and camp infrastructure. The US$40 million forms part of the total capital expenditure of US$285 million for Stage 2. The expansion will add 25,000 tonnes per annum (tpa) of lithium carbonate and bring Olaroz total production capacity to 42,500tpa.
  • Orocobre and Toyota Tsusho Corporation (TTC) continue to advance plans for the proposed 10,000tpa Naraha Lithium Hydroxide Plant to be built in Japan. Negotiations continue for the Engineer, Procure and Construct (EPC) contract and are expected to be completed in the September quarter
  • Progress continues to be made towards final investment decisions for both the Olaroz expansion and Naraha lithium hydroxide projects. In particular, work has advanced regarding debt packages for both projects and the JV structural elements for the hydroxide plant.

 

Borax Argentina

  • Overall sales volume in the June quarter was up 16.6% on March quarter to 10,590 tonnes
  • Sales have continued to steadily improve during the quarter with a strong focus on market development
  • The Tincalayu Expansion Project feasibility study is in the final stages of internal review.

 

Cauchari Joint Venture (Advantage Lithium – operator 75% / Orocobre 25%)

  • An updated resource estimate was released during the June quarter detailing a +6-fold increase of the inferred resource to 3.0 Mt Lithium Carbonate Equivalent (LCE) at Cauchari at 450 mg/l lithium
  • Advantage Lithium has now undertaken drilling at 12 locations within the Cauchari tenements and has completed Phase 1 and 2 of the drilling program with Phase 3 drilling underway to upgrade this inferred resource and underlying brine to measured and indicated resources
  • The NI43-101 Technical Report on the resource upgrade of the Cauchari Lithium Project was completed and released late in the June quarter to support the conclusions presented in the updated resource estimate
  • A Preliminary Economic Assessment is planned for completion in Q3 2018 followed by a Feasibility Study to be completed by early 2019.

Published by: Panorama Minero

Category: News

Revista

Edición 533 - agosto 2024
Edición 532 - Julio 2024
Edición 531 - Junio 2024
Edición 530 - Mayo 2024
Edición 529 - Abril 2024
2024 Argentine Mining Compendium
Edición 528 - Marzo 2024
Edición 527 - Febrero 2024
Edición 526 - Diciembre 2023
Edición 525 - Noviembre 2023
Edición 524 - Octubre 2023
Edición 523 - Septiembre 2023

Eventos

  • Expo San Juan
  • Lithium in South America

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Imagen ilustrativa para el artículo: Argentina Lithium & Energy adquiere nuevas propiedades de litio en Argentina

Argentina Lithium & Energy adquiere nuevas propiedades de litio en Argentina

La compañía canadiense, miembro del Grosso Group, anunció la finalización de acuerdos de opción para adquirir casi 25.400 hectáreas de tierras ricas en litio en sus proyectos Rincón Oeste, Pocitos y Antofalla Norte. En un entorno bajista, este movimiento estratégico subraya la visión de la empresa en la búsqueda por expandir su cartera de proyectos.
Imagen ilustrativa para el artículo: Salta: AbraSilver completa la Evaluación de Impacto Ambiental para el proyecto Diablillos

Salta: AbraSilver completa la Evaluación de Impacto Ambiental para el proyecto Diablillos

AbraSilver Resource Corp. anunció la finalización de la Evaluación de Impacto Ambiental (EIA) para su proyecto de plata y oro Diablillos, ubicado en Salta. La culminación de esta evaluación marca un avance crucial hacia la fase de desarrollo del proyecto, que espera alcanzar positivos rendimientos en torno al uso del agua, el ambiente y el impacto socioeconómico.
Imagen ilustrativa para el artículo: San Juan presente en el "Encuentro Minero Chileno - Argentino"

San Juan presente en el "Encuentro Minero Chileno - Argentino"

Organizada por la Embajada Argentina en el país vecino y la Cámara Chileno Argentina, se llevó a cabo la séptima edición del "Encuentro Minero Chileno Argentino", que congrega a los principales actores de la industria minera de ambos países, con la participación de una delegación minera de San Juan, encabezada por el ministro de Minería, Juan Pablo Perea.