SSR Mining Inc. reported fourth quarter and year-end 2018 operating results. Related to Puna Operations (a 75%/25% with Golden Arrow, located in Jujuy province), it exceeded the upper end of the revised annual silver production guidance with a total of 3.7 million ounces. With the declaration of commercial production at the Chinchillas mine in December 2018, SSR Mining produced 1.2 million ounces of silver in the fourth quarter, a 79% increase over the third quarter, as the mill averaged nearly 3,800 tonnes per day.

In 2018, Puna Operations produced a total of 3.7 Moz of silver, 8.8 million pounds of zinc and 3.1 million pounds of lead. The quantity of silver ounces sold for 2018 totaled 3.8 Moz. On an attributable basis of 75%, silver production and sales in 2018 totaled 2.8 Moz and 2.8 Moz, respectively. During the year, the ore was ground at an average of 3,890 tons per day. The ground ore contained an average silver grade of 114 g/t. The average metallurgical recovery of silver was 72.1%, an increase of 3% compared to 2017.

In the fourth quarter of 2018, silver production was 1.2 Moz, an increase of 79% in relation to the third quarter, mainly due to the increase in the tonnage of ground ore of higher grade of Chinchillas.

During the fourth quarter, the ore was ground at an average of 3,720 tons per day. In December, the ore was obtained exclusively from Chinchillas and reached a milling rate of 3,605 tons per day. The ore processed in the fourth quarter contained an average silver grade of 133 g/t, an increase of 38% compared to the third quarter of 2018, due to the processing of high quality ore from Chinchillas in December. The average silver recovery in the fourth quarter was 81.5%.

In Puna Operations, with the commercial start of Chinchillas in the open sky already reached, the year 2019 marks the first full period of mineral production at the Chinchillas mine, transported for processing at the Pirquitas mine plant. Puna Operations is expected to produce between 6 Moz and 7 Moz of silver. Capital investments in Puna Operations of US$12 million include US$5 million for the maintenance of the mine equipment and US$ 5million for the maintenance of the plant equipment.

Publicado por: Panorama Minero

Categoría: Noticias

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Imagen ilustrativa para el artículo: Glencore nombra a Martín Pérez de Solay como CEO en Argentina

Glencore nombra a Martín Pérez de Solay como CEO en Argentina

Se trata de uno de los ejecutivos mineros que estuvo a cargo del desarrollo de la operación de litio Olaroz. Llega al sector del cobre motivado por la intención de Glencore de avanzar sus proyectos en Argentina aprovechando un favorable viento de cola para la industria.
Imagen ilustrativa para el artículo: Los Azules y la UCCuyo lanzan Diplomatura en Control de Calidad en Calingasta

Los Azules y la UCCuyo lanzan Diplomatura en Control de Calidad en Calingasta

Con el objetivo de fortalecer la formación de profesionales en construcción y obras civiles, el proyecto Los Azules y la Universidad Católica de Cuyo desarrollarán una Diplomatura en Inspección de Control de Calidad en Proyectos de Infraestructura y Construcción, que se dictará en Calingasta.
En su 20° aniversario Veladero consolida su rol estratégico en el desarrollo de San Juan y su contribución a la economía nacional

En su 20° aniversario Veladero consolida su rol estratégico en el desarrollo de San Juan y su contribución a la economía nacional

San Juan – 28 de Marzo de 2025. En el marco del 20° aniversario de producción de la mina Veladero, el presidente y CEO de Barrick, Mark Bristow, visitó San Juan para presentar ante la prensa local un balance actualizado del desempeño de Veladero en 2024 y compartir la visión de futuro para uno de los activos mineros más importantes del país.